It ‘s been 4 years since I work for ArcelorMittal in Cartier as Rail traffic controller . In January 2016, I decided to write a book on the railway . In writing this book , I have developed a great passion for my job and the railway. I decide to sell all my HO BC Rail equipment and complete my layout in favor of QCM .
Three floors will complete the railway line between Port and Mount Wright. Several bridges have been added, as well as two siding. Two turning loops conclude the end of the mainline at Port and at Wright for the loading and unloading of the ore trains.
I will publish all blog post in french so I translate them with Google.
Aucun commentaire:
Publier un commentaire